Silverstone Lake Interceptor Sewer
On February 19, 2024, the Village completed an emergency repair on a failed section of existing sanitary force main located on Kings Road between Skyline Drive and Amarillo Drive. The force main, constructed in the early 2000s, services the Silverstone Lake Subdivision and is part of a conveyance system consisting of the force main, gravity flow sewer, and lift station. Due to its shorter life expectancy and the need for future sewer improvements, the Village retained an engineering consultant to perform a Phase I Preliminary Engineering Study.
Lincoln Avenue-Highland Avenue-Hillside Street Reconstruction Project
The design is currently underway for the future reconstruction of the roadways and utilities located at Lincoln and Highland avenues. Funding for construction will be discussed as part of future fiscal year budget planning.
Lincoln-Highland-Hillside Project Map
L.W. Besinger Drive Reconstruction Project
The Village was awarded $1.8 in Federal Surface Transportation Program funds through the Kane Kendall Council of Mayors. These funds will cover 30% of final design and 70% of construction costs for L.W. Besinger Drive from Ball Avenue to IL-25 including intersection and minor signal improvements.
In the Fall of 2023, a Public Meeting was held to discuss proposed improvements on L.W. Besinger Drive. The proposed work generally consists of roadway resurfacing from Lake Marian Road to Ball Avenue, and roadway reconstruction, which includes new curb and gutter, driveway aprons, pedestrian upgrades, storm sewer improvements, and street lighting, from Ball Avenue to Illinois Route 25. Additionally, L.W. Besinger Drive at Illinois Route 25 proposes a dedicated right turn lane with signal modifications. The project is currently in the Phase I Planning stage, followed by Phase II Design. The Phase III Construction is anticipated for Spring/Summer in 2025.